Home / About
India's data center capacity is on track to triple by 2030. Most of the new load is AI. Almost none of the existing footprint is built for it. That's the gap we exist to close.
Hydroniq Technologies is a Chennai-based specialist distributor of liquid cooling components for AI data centers. We were started in 2025 by infrastructure engineers who watched India's AI data center pipeline go from "interesting" to "load-bearing for the entire economy" inside a single budget cycle — and noticed that the supply chain for the only thing that makes those workloads physically possible had no Indian address.
Our mission is straightforward: make liquid cooling a procurement decision, not a research project. That means authorised relationships with the vendors that actually matter, engineering staff who can size a 1.2 MW CDU loop without phoning the OEM, in-country stock for the consumables you'll need monthly, and a single SLA from PO to commissioning.
Why this matters now. A modern training rack — eight Blackwell-class GPUs per server, eight servers per rack — dissipates more heat than an entire pre-2020 row. India is targeting tens of gigawatts of new data center capacity over the next five years. If even a tenth of that is AI-grade, the country needs an order of magnitude more dielectric fluid, manifolds, CDUs, and immersion tanks than has ever been imported into it. We intend to be the channel that makes that possible in the south.
What we're not. We don't sell racks, power distribution, or whitespace. We don't pretend to be a hyperscaler EPC. We're a focused distribution and integration partner with deep inventory in one part of the stack — and we work alongside your existing MEP, design, and commissioning teams.
15+ years across data center MEP and critical facilities. Previously led infrastructure programmes at [ placeholder ].
Mechanical engineer specialising in liquid loop design, fluid handling, and CDU commissioning across direct-to-chip and immersion deployments.
— Let's talk —
The cooling decision drives the rack decision, the power decision, and the building shell. We're happy to consult before there's a PO on the table.